Hot Sales Premium Solid Teak Chair

FOB Price:USD 30.0-50.0/Set Get Latest Price
Model:FY-S32
Certification:SGS,ISO9001:2008
Capable:SGS,ISO9001:2008
Minimum Order:500set
Brand Name:Fully
Brief Description:1,Durable solid teak seat construction 2.Vented design for air and water flow3.Aluminum frame4.Variable height adjustment

Eliot An

  • Product Details

Basic Specification

colornatural
framealuminum frame
woodensolid teak

Detail Description

Product Description

tem

Hot Sale  Premium Solid Teak Chair

Model Number

FY-S32

Size

Customized

Material

Teak Wood

Color

Natural or Customized

 

Product Photo

 

 

Features

1.Popular and modern style

2,Durable solid teak seat ,lightweight construction,water resistant,comfortable seating
3.Vented design for air and water flow
4.Matte aluminum legs with nonslip footpads
5.Variable height adjustment,Adjustable height  33cm-45.5cm

6.Sit comfortably in or out of shower, fits securely in bathtub

7.Holds up to 250lbs

8,Disassemble without tool 

9.Seat dimensions:19.75in. L x 16 in W /50 cm L x 40.6 cm W

10.9.Warranty: 1 year limited

 

Advantage

1.Premium quality

2.Reasonable price

3.Prompt delivery

4.OEM or ODM are available

5.Professional service

    The solid teakwood seat is a comfortalbe place to sit while shaving or showering. Raisd side handles are easy to grip ,balance,support and a perfect spot to hang a facecloth or small towel. Matte aluminum legs adjust to add up to 5 extra of height for greater comfort, and nonslip footpads add stalbity for safety and floor protection.

  Our quality is guaranteed by ISO9001:2008 Quality Management System.

 

Work Process

A.Requirements Confirmation:

Fully understanding client's requirement without missing any details.

B.Pricing:

Offer highly competitive price to client according to the detailed information of requirement.

C.Sample Making:

After price confirmed, make sample for client to further confirm if it can meet the requirement.

D.Mass Production:

After sample confirmed and bulk order placed, go ahead with the mass production.

E.Project Management:

During the Mass Production, keep client posted the production status regularly, to make every issue found and solved at the very beginning, to ensure production finished on time.

F.Shipping Arrangement:

After production finished, do the paper work to make every required document ready and arrange the shipment for client.

 

 

 

 

If you are interested in any of our products, please contact us for more details. We are looking forward to establishing long-term business relationships with you in the near future.Welcome!!!

 


Additional Information

Payment TermsT/T
Minimum Order500set
Lead Time / Delivery Time30 Day(s)
Sample AvailableYES Ask For Sample
Delivery Details30 days after order confirmation and receipt of your 30% deposit.
FOB PortShenzhen,
Loading Infosmall quantity: deliver it to Shenzhen port by truck,then deliver it by groupage traffic.large quantity: deliver it directly by container.
Packing Info2pcs/carton, carton dimension:22.64in x 16.33in x 6.3in(57.5x41.5x16cm)1300ctns/40'HQ
Target Market(s)North America, Oceania, Eastern Europe, Latin America, Middle East & South Asia, Northern Europe, Middle East

Send your message to this manufacturer


3000
SearchPost Buying Lead